Transport for NSW is consulting on a recommended corridor of land for the Bells Line of Road – Castlereagh Connection for a possible high quality road.
The Bells Line of Road – Castlereagh Connection corridor would extend about 45km between Bells Line of Road at Kurrajong Heights and the existing motorway network at the Junction of Richmond Road and the M7 Motorway at Colebee.
Transport for NSW is now seeking feedback on the recommended corridor by 18 May 2018. To meet the project team, visit a stand or community drop in session.